The Port Coogee Marina Expansion

Share on Facebook Share on Twitter Share on Linkedin Email this link

Consultation has concluded

Port Coogee Marina Expansion


Background

The Port Coogee Marina was originally designed so that it could be expanded in the future to meet the demand for more boat bays. In 2018, with occupancy rates reaching above 90%, the wait list for boat bays growing, and residential developments underway on Maraboo Island, the City commenced the process for expansion. Two preliminary concept designs for the expansion were presented and endorsed to Council at the June 2018 Ordinary Council Meeting.

As part of Local Government Act 1995, a Business Case for the expansion was then developed and a preferred draft design adopted. From September to October 2019, the City sought community feedback on the Business Case and draft design over a 42-day advertised public comment period.

You Said

The Comment on Cockburn project page was visited 816 times across the comment period time frame. Documents (the business case and preferred concept layout) were downloaded 451 times and the public survey was visited 166 times.

Here is a snapshot of what you told us.

Feedback from the comment period was presented to Council at the December 2019 Ordinary Council Meeting. You can view the full report here.

Following input from the community, the City will work with consultants to develop a detailed design for the expansion and seek to secure funding for the delivery of Stage 1 of the expansion with the 2020/21 budget.

More information

  • View the FAQ (on the right hand side of this page)
  • Contact the project team from the City of Cockburn

Ph: 9411 3444

E: customer@cockburn.wa.gov.au

Port Coogee Marina Expansion


Background

The Port Coogee Marina was originally designed so that it could be expanded in the future to meet the demand for more boat bays. In 2018, with occupancy rates reaching above 90%, the wait list for boat bays growing, and residential developments underway on Maraboo Island, the City commenced the process for expansion. Two preliminary concept designs for the expansion were presented and endorsed to Council at the June 2018 Ordinary Council Meeting.

As part of Local Government Act 1995, a Business Case for the expansion was then developed and a preferred draft design adopted. From September to October 2019, the City sought community feedback on the Business Case and draft design over a 42-day advertised public comment period.

You Said

The Comment on Cockburn project page was visited 816 times across the comment period time frame. Documents (the business case and preferred concept layout) were downloaded 451 times and the public survey was visited 166 times.

Here is a snapshot of what you told us.

Feedback from the comment period was presented to Council at the December 2019 Ordinary Council Meeting. You can view the full report here.

Following input from the community, the City will work with consultants to develop a detailed design for the expansion and seek to secure funding for the delivery of Stage 1 of the expansion with the 2020/21 budget.

More information

  • View the FAQ (on the right hand side of this page)
  • Contact the project team from the City of Cockburn

Ph: 9411 3444

E: customer@cockburn.wa.gov.au

Consultation has concluded
  • Development Application DA20/0108 advertised for public comment

    Share on Facebook Share on Twitter Share on Linkedin Email this link
    27 February, 2020

    In accordance with the Planning and Development Act 2005, the Development Application (DA20/0108) for Stage 1 of the expansion is being advertised for public comment.

    The proposal for Stage 1 consists of the following:

    • An additional 90 berths (approximate) ranging from 10m to 30m in size;
    • Floating jetties;
    • Two gatehouses/stores;
    • A boardwalk along the Southern perimeter of Maraboo Island; and
    • Re-configuration of the existing car bays on Maraboo Island to increase from 17 bays up to 27.

    View and Comment on the Planning Application

    • In person - Contact the City of Cockburn 08 9411 3444 or customer@cockburn.wa.gov.au
    Submissions close 11 March 2020