Planning Application - DA20/0108 - 54L, 53L & 5 Maraboo Loop North Coogee - Extension to Marina Service Jetties, Boardwalk and Marina Expansion

Share on Facebook Share on Twitter Share on Linkedin Email this link

Consultation has concluded


Background

The Port Coogee Marina has been managed by the City of Cockburn since July 2016, with the City committing to completing the marina to its full capacity. With the current significant waiting list and full occupancy of existing berths, it is recognised that the marina expansion is now required to accommodate the increasing demand.

The expansion takes form in two stages, noting that Stage 2 will be reviewed at a later date and does not form part of this application.

The proposal for Stage 1 consists of the following:

  • An additional 90 berths (approximate) ranging from 10m to 30m in size;
  • Floating jetties;
  • Two gatehouses/stores;
  • A boardwalk along the Southern perimeter of Maraboo Island; and
  • Re-configuration of the existing car bays on Maraboo Island to increase from 17 bays up to 27.

To view the planning application, click the links in the Document Library on this page.

Submissions

Complete the online submission form below by 11 March 2020.


Background

The Port Coogee Marina has been managed by the City of Cockburn since July 2016, with the City committing to completing the marina to its full capacity. With the current significant waiting list and full occupancy of existing berths, it is recognised that the marina expansion is now required to accommodate the increasing demand.

The expansion takes form in two stages, noting that Stage 2 will be reviewed at a later date and does not form part of this application.

The proposal for Stage 1 consists of the following:

  • An additional 90 berths (approximate) ranging from 10m to 30m in size;
  • Floating jetties;
  • Two gatehouses/stores;
  • A boardwalk along the Southern perimeter of Maraboo Island; and
  • Re-configuration of the existing car bays on Maraboo Island to increase from 17 bays up to 27.

To view the planning application, click the links in the Document Library on this page.

Submissions

Complete the online submission form below by 11 March 2020.

  • CLOSED: This survey has concluded.

    Thank you for providing your input.


    Consultation has concluded
    Share on Facebook Share on Twitter Share on Linkedin Email this link