Should the Shark Barrier Stay at Coogee Beach?

Share Should the Shark Barrier Stay at Coogee Beach? on Facebook Share Should the Shark Barrier Stay at Coogee Beach? on Twitter Share Should the Shark Barrier Stay at Coogee Beach? on Linkedin Email Should the Shark Barrier Stay at Coogee Beach? link

Consultation has concluded


Background

Three years ago, the City of Cockburn installed the State’s first Eco Shark Barrier at Coogee Beach for a three-year trial, allowing people to enjoy a safe swimming environment all year round. The physical barrier is recyclable and safe for marine animals and the environment. The area has become a popular and safe swimming destination for people from around Perth.

  • The barrier is 300 metres long and 75 metres wide.
  • It costs about $100,000 a year to lease.
  • It extends from seabed to surface and creates a safe swimming beach.
  • It is a strong physical barrier made from a sturdy flexible nylon with steel cables.
  • It is expected to last at least 10 years and can be recycled at the end of its life.
  • The barrier does not harm marine life but provides a unique marine habitat while it is in place.
  • It has proven to be a popular destination for swimmers from all around Perth.
  • It attracts school students and other swimming groups.
  • During summer months, one of the City's three pontoons remains in the barrier, providing a source of entertainment for swimmers.

Have Your Say

Now that the three-year trial is about to end in November 2017, the City seeks your feedback about whether the barrier should stay or go?

Please vote in our online poll below and/or leave a comment by Friday 30 June 2017.


Background

Three years ago, the City of Cockburn installed the State’s first Eco Shark Barrier at Coogee Beach for a three-year trial, allowing people to enjoy a safe swimming environment all year round. The physical barrier is recyclable and safe for marine animals and the environment. The area has become a popular and safe swimming destination for people from around Perth.

  • The barrier is 300 metres long and 75 metres wide.
  • It costs about $100,000 a year to lease.
  • It extends from seabed to surface and creates a safe swimming beach.
  • It is a strong physical barrier made from a sturdy flexible nylon with steel cables.
  • It is expected to last at least 10 years and can be recycled at the end of its life.
  • The barrier does not harm marine life but provides a unique marine habitat while it is in place.
  • It has proven to be a popular destination for swimmers from all around Perth.
  • It attracts school students and other swimming groups.
  • During summer months, one of the City's three pontoons remains in the barrier, providing a source of entertainment for swimmers.

Have Your Say

Now that the three-year trial is about to end in November 2017, the City seeks your feedback about whether the barrier should stay or go?

Please vote in our online poll below and/or leave a comment by Friday 30 June 2017.

Discussions: All (1) Open (0)
  • Shark barrier - should it stay?

    by deanie, almost 7 years ago
    Share Shark barrier - should it stay? on Facebook Share Shark barrier - should it stay? on Twitter Share Shark barrier - should it stay? on Linkedin Email Shark barrier - should it stay? link
    CLOSED: This discussion has concluded.

    The barrier was placed at Coogee Beach for a three-year trial which ends in November 2017. Please provide your views here about your experiences using this beach and whether you think the barrier should remain?