Share Safety Upgrades - Maraboo and Othello Bridges, Ngarkal Beach, North Coogee on Facebook Share Safety Upgrades - Maraboo and Othello Bridges, Ngarkal Beach, North Coogee on Twitter Share Safety Upgrades - Maraboo and Othello Bridges, Ngarkal Beach, North Coogee on Linkedin Email Safety Upgrades - Maraboo and Othello Bridges, Ngarkal Beach, North Coogee link

Consultation has concluded


Thank you for your feedback. Comments are closed. View the news feed below for more information on the progress of this engagement.


To improve safety, the City of Cockburn is installing anti-climb structures on the Othello and Maraboo Bridges at Ngarkal Beach in North Coogee. The anti-climb structures will be installed on the northern side of Maraboo Bridge, and both sides of Othello Bridge to prevent swimmers from jumping off. 

Two design options have been prepared and artwork themes are being explored for some perforated panelling. These panels form part of the anti-climb structures. 

Have your say

We would like to hear your thoughts on the structural design options and artwork themes for the perforated panels. 


Thank you for your feedback. Comments are closed. View the news feed below for more information on the progress of this engagement.


To improve safety, the City of Cockburn is installing anti-climb structures on the Othello and Maraboo Bridges at Ngarkal Beach in North Coogee. The anti-climb structures will be installed on the northern side of Maraboo Bridge, and both sides of Othello Bridge to prevent swimmers from jumping off. 

Two design options have been prepared and artwork themes are being explored for some perforated panelling. These panels form part of the anti-climb structures. 

Have your say

We would like to hear your thoughts on the structural design options and artwork themes for the perforated panels. 

  • Structural Design A - Open Structure (view in the Document Library here)
  • Structural Design B - Closed Structure (view in the Document Library here)

Community feedback will be considered in the final design process. The City must also consider other constraints such as budget and maintenance requirements.

Closes 4pm Monday 11 April 2022
Online
Complete the feedback form 
below

hard copy survey iconHard copy
Pick up and return to City of Cockburn Marina Office (Maraboo Loop, North Coogee - downstairs next to the land sales office)

Email
Write a submission to [email protected]
Remember to include your name, address and project name

Phone
Contact the City of Cockburn during business hours on 08 9411 3444

Question icon

Ask a question
Post on the Question and Answer board 
below 



Consultation has concluded
  • Project Update: November 2022

    Share Project Update: November 2022 on Facebook Share Project Update: November 2022 on Twitter Share Project Update: November 2022 on Linkedin Email Project Update: November 2022 link
    CLOSED: This discussion has concluded.

    Following community consultation in early 2022, the City has been working with architects to finalise designs for the new anti-climb structures for the Othello and Maraboo bridges.

    Design outcomes

    In line with community preferences, architects opted for an open-structure design (Design A) and perforated panels with marine-themed shapes. Additional design feedback has been considered where viable from an engineering, maintenance and budget perspective.

    Next steps

    Consultation has concluded.

    The City expects to go out to tender for construction in early 2023. The City anticipates the anti-climb structures to be installed by late 2023; however, due to the current global economic conditions, timing is subject to material availability and budget.

    More information

    For more information please contact the project team on 08 9411 3444 or [email protected].


  • Project Update: May 2022

    Share Project Update: May 2022 on Facebook Share Project Update: May 2022 on Twitter Share Project Update: May 2022 on Linkedin Email Project Update: May 2022 link
    CLOSED: This discussion has concluded.

    Thank you for your feedback

    The City asked for your feedback on two design options for new anti-climb structures on the Othello and Maraboo bridges in North Coogee. We also asked which artwork themes we should consider for some perforated panels, which will form part of these structures.

    What we heard

    Project communications were sent to over 500 North Coogee residents and signs were installed on site. More than 350 people visited the project page and 88 people provided feedback. Thank you for having your say.

    • Design A (open design anti-climb structure) is the preferred design (78.5% prefer Design A; 4.5% prefer Design B; 2.5% prefer both; and 14.5% prefer none of the options).
    • Why respondents prefer Design A:
      • Aesthetics,
      • Perceived cost,
      • Design (most difficult to climb),
      • Lower maintenance, and
      • Safety (open design appears safer to walk through in periods of low light).
    • ‘Marine’ is the preferred (73%) artwork theme for the perforated panels.
    • Why respondents prefer ‘marine’ theme:
      • Fits with the area.

    Next steps

    Key findings have been reviewed will be considered in the final design process. When available, a final project update will be detailed on this page. The upgrades are expected to be installed in the 2022-23 financial year.

    More information

    For more information about this project please contact the project team on 08 9411 3444 or [email protected].